2
Dec.3Tech supplied 13 (12+1) 2200kW 11kV standby generator systems for the Huizhou Tonghu Data Centre Phase 1. Phase 1 will be completed in 2021 and Phase 2 in 2022. Once completed, the data centre area is over 45,000 square metre. This data centre is designed according to the highest Class A requirements of China Data Centre GB standard.
Read More29
Sept.Super Typhoon Mangkhut stormed Hong Kong in September 2018, uprooted more than 60,000 trees and caused havoc to the city. The Environmental Protection Department (EPD) of HKSAR Government established Y‧PARK, a yard waste recycling facility to turn the fallen trees and other general yard waste into useful products in order to increase the recycling scale and diversity in Hong Kong. The site is located at Tsang Tsui which is a temporary one for 3 to 5 years before a long-term recycling facility is ready. 3Tech proudly announces our participation in providing two different innovative and unique hybrid energy systems for the site where permanent power is not available.
Read More23
Jul.At the 2019 annual energy efficiency and environmental conference held by Telefonica in the city of Seville, Spain, our Sales team presented LionRock energy solution products to all potential telecom operators in the family. After that, 3Tech was invited to the upcoming telecom power system Global Framework agreement tender. Being a new comer, 3Tech’s LionRock telecom energy solution products were awarded a pilot project of sixteen (16) units of our DC power cabinet, a solution that includes: system controller, batteries, rectifiers, and DC distribution system.
Read More8
Jun.3Tech recently delivered a more environmental friendly charging solution for electric cars which is a step ahead of the typical mains powered solutions.
Read More13
Apr.3Tech delivered a LionRock LRP1100 outdoor silent containerized diesel generator to HeYuan in Guangdong.This turnkey project including comprehensive system design, installation and commissioned on site.
Read MoreSTAY CONNECTED